1. When measuring the static fluid level in the opening container, the liquid level transmitter is put vertically into the bottom of the container, and the cable and wiring box of the connected transmitter are fixed at the opening of the container.
2. When the medium viscosity is large, the sleeve or bracket can be installed to ensure that the transmitter can invest in the bottom of the belt.
3. When installed in the open air, try to place the transmitter wiring box in a ventilated and dry place to avoid direct light and rain, resulting in too high the temperature of the shell or water inlet and damaging the internal circuit board.